Home

EVM

iLP

HDR

CFP

HES

HC

HTM

SRH / SRHD

Contact us

EVM Stainless Steel Vertical Multistage Pump

 

EVM Pump Models

Model

Main Flow

(m3/h)

No of Impellers

(Each)

No of Reduced Impellers

(Each)

P max

(bar)

Motor

(KW,

60Hz)

EVM03

EVM0302/0.55

3

2

 

16

0.55

EVM0303/0.55

3

3

 

0.55

EVM0304/0.75

3

4

 

0.75

EVM0305/1.1

3

5

 

1.1

EVM0306/1.1

3

6

 

1.1

EVM0307/1.5

3

7

 

1.5

EVM0308/1.5

3

8

 

1.5

EVM0309/2.2

3

9

 

2.2

EVM0311/2.2

3

11

 

25

2.2

EVM0312/2.2

3

12

 

2.2

EVM0313/3.7

3

13

 

3.7

EVM0315/3.7

3

15

 

3.7

EVM0318/3.7

3

18

 

3.7

EVM05

EVM0502/0.75

5

2

 

16

0.75

EVM0503/1.1

5

3

 

1.1

EVM0504/1.5

5

4

 

1.5

EVM0505/2.2

5

5

 

2.2

EVM0506/2.2

5

6

 

2.2

EVM0507/3.7

5

7

 

3.7

EVM0508/3.7

5

8

 

3.7

EVM0510/3.7

5

10

 

3.7

EVM0511/3.7

5

11

 

25

3.7

EVM0512/3.7

5

12

 

3.7

EVM0514/5.5

5

14

 

5.5

EVM0516/5.5

5

16

 

5.5

EVM0519/7.5

5

19

 

7.5

EVM10

EVM1002/1.5

10

2

 

16

1.5

EVM1003/2.2

10

3

 

2.2

EVM1004/3.7

10

4

 

3.7

EVM1005/3.7

10

5

 

3.7

EVM1006/3.7

10

6

 

3.7

EVM1008/5.5

10

8

 

5.5

EVM1010/7.5

10

10

 

25

7.5

EVM1011/7.5

10

11

 

7.5

EVM1012/7.5

10

12

 

7.5

EVM1014/11

10

14

 

11

EVM1016/11

10

16

 

11

EVM18

EVM1801/2.2

18

1

 

16

2.2

EVM1802/3.7

18

2

 

3.7

EVM1803/5.5

18

3

 

5.5

EVM1804/7.5

18

4

 

7.5

EVM1805/7.5

18

5

 

7.5

EVM1806/11

18

6

 

11

EVM1807/11

18

7

 

25

11

EVM1808/15

18

8

 

15

EVM1810/15

18

10

 

15

EVM1811/18.5

18

11

 

18.5

EVM1812/18.5

18

12

 

18.5

EVM32

EVM3201-0/3.7

32

1

 

16

3.7

EVM3202-0/7.5

32

2

 

7.5

EVM3202-2/5.5

32

2

2

5.5

EVM3203-0/11

32

3

 

11

EVM3203-3/7.5

32

3

3

7.5

EVM3204-0/15

32

4

 

15

EVM3204-3/11

32

4

3

11

EVM3205-0/18.5

32

5

 

18.5

EVM3205-2/15

32

5

2

15

EVM3206-0/22

32

6

 

25

22

EVM3206-3/18.5

32

6

3

18.5

EVM3207-0/30

32

7

 

30

EVM3207-2/22

32

7

2

22

EVM3208-0/30

32

8

 

30

30

EVM3209-0/30

32

9

 

30

EVM3210-4/30

32

10

4

30

EVM45

EVM4501-0/7.5

45

1

 

16

7.5

EVM4501-1/5.5

45

1

1

5.5

EVM4502-0/15

45

2

 

15

EVM4502-1/11

45

2

1

11

EVM4503-0/22

45

3

 

22

EVM4503-1/18.5

45

3

1

18.5

EVM4503-2/15

45

3

2

15

EVM4504-0/30

45

4

 

30

EVM4504-2/22

45

4

2

22

EVM4505-0/37

45

5

 

25

37

EVM4505-1/30

45

5

1

30

EVM4506-1/37

45

6

1

37

EVM64

EVM6401-0/11

64

1

 

16

11

EVM6401-1/7.5

64

1

1

7.5

EVM6402-0/22

64

2

 

22

EVM6402-1/18.5

64

2

1

18.5

EVM6402-2/15

64

2

2

15

EVM6403-0/30

64

3

 

30

EVM6403-3/22

64

3

3

22

EVM6404-1/37

64

4

1

37

EVM6404-3/30

64

4

3

30

Performance Curve

Sectional Drawing & Spare Parts for 60Hz (3600rpm)

 

 

NO.

Part Name

Material

EVM

EVML

005-1

Suction Casing

STS304

STS316

005-2

Intermediate Casing

STS304

STS316

005-3

Intermediate Casing Bearing

STS304

STS316

005-4

Discharge Casing

STS304

STS316

006

Bottom Casing

STS304/SSC13

STS316/SSC14

007

Outer Casing

STS316/STS304

STS316

011

Casing Cover

Cast Iron/STS304

Cast Iron/STS316

012

Suction Cover

STS304

STS316

021

Impeller

STS304

STS316

031

Shaft

STS316

039-1

Key

Carbon Steel

043-1

Shaft Sleeve (Mechanical seal)

STS304

STS316

043-2

Shaft Sleeve (Intermediate)

STS304

STS316

043-3

Shaft Sleeve (Bearing)

STS304

STS316

043-4

Shaft Sleeve (Adjustment)

STS304

STS316

043-5

Shaft Sleeve (Last Stage)

STS304

STS316

043-6

Shaft Sleeve (Adjustment)

STS304

STS316

043-7

Shaft Sleeve (Bottom Bearing)

STS304

STS316

043-8

Shaft Sleeve (Discharge/Lower)

STS304

STS316

044-1

Shaft Sleeve Bearing

Tungsten Carbide

044-2

Bearing Sleeve

Tungsten Carbide

045

Flange Holder

STS420

047

Ring Holder

STS304

STS316

048

Impeller Nut

A2-70 UNI 7323

A4-70 UNI 7323

051

Motor Adapter

Cast Iron EN-GJL-200 EN 1561

052-1

Bearing

Tungsten Carbide

052-2

Bearing

Tungsten Carbide

053

Bush Holder

STS304

STS316

056

Ball Bearing

-

070-1

Ring for Bearing

STS304

070-2

Ring for Bearing

STS304

STS316

081

Bush

PTFE

107

Liner Ring

EPDM/STS304(03~18), PTFE/STS316(32~45)

PTFE / STS316

111-1

Mechanical Seal

Silicon Carbide / Carbon / FPM

111-2

Mechanical Seal Cartridge

STS304

STS316

111-3

Mechanical Seal Seat

STS304

STS316

111-4

Seal Holder

Brass OT 58 UNI 5705

STS316

111-5

Adjusting Ring

STS304

STS316

115-1

O-Ring (Outer Casing)

EPDM

FPM

115-2

O-Ring (Intermediate Casing)

EPDM

FPM

115-4

O-Ring (Cartridge Sleeve)

EPDM

FPM

115-5

O-Ring (Seal Cover)

EPDM

FPM

120

Tie-rod

Zincate Steel 6.8 Strength Class 898/1

120-3

Screw (Mechanical Seal)

A2-70 UNI 7323

120-4

Screw (Casing Cover)

Zincate Steel 8.8 Strength Class 898/1

120-5

Screw for Coupling(Pump)

Zincate Steel 8.8 Strength Class 898/1

120-6

Screw for Coupling(Motor)

Zincate Steel 8.8 Strength Class 898/1

120-7

Screw (Coupling Bearing)

Zincate Steel 8.8 Strength Class 898/1

120-9

Screw (Bearing Sleeve)

STS304

STS316

120-12

Screw (Shaft Spacer)

STS304

STS316

120-13

Screw (Motor Adapter)

Zincate Steel 8.8 Strength Class 898/1

130-2

Screw for Coupling Guard

A2-70 UNI 7323

131-1

Pin for Shaft

Carbon Steel

136

Bearing Washer

Carbon Steel

137-1

Impeller Spacer

STS304

STS316

137-2

Shaft Spacer

STS304

STS316

140

Coupling

Brass OT 58 UNI 5705

140-1

Motor Coupling

Carbon Steel

140-2

Coupling (Pump Side)

Carbon Steel

150

Spacer

Carbon Steel

160

Base

Cast Iron EN-GJL-200 EN 1561

162

Motor Bracket

Cast Iron EN-GJL-200 EN 1561

212

Plug

STS304

STS316

245

Coupling Guard

STS304

274-1

C-Type Snap Ring (M/Seal)

STS304

STS316

274-2

C-Type Snap Ring (Coupling)

Carbon Steel TC80

274-3

C-Type Snap Ring (Bracket)

Carbon Steel TC80

613

Flange

-

 

 

 

V-EVM Stainless Steel Vertical Booster Pump

 

Performance Curve

V-EVM Pump Models

Model

Connections

(mm) 

Motor

Capacity

(L/m) 

Head

(m) 

Pressure Tank

(L)

KW

No

V-2EVM0304

50

0.75

2

50~160

26~48

200

V-2EVM0305

50

1.1

2

50~160

32~61

200

V-2EVM0306

50

1.1

2

50~160

39~72

200

V-2EVM0307

50

1.5

2

50~160

46~85

200

V-3EVM0304

50

0.75

3

75~240

26~48

200

V-3EVM0305

50

1.1

3

75~240

32~61

200

V-3EVM0306

50

1.1

3

75~240

39~72

200

V-3EVM0307

50

1.5

3

75~240

46~85

200

V-4EVM0304

50

0.75

4

100~320

26~48

200

V-4EVM0305

50

1.1

4

100~320

32~61

200

V-4EVM0306

50

1.1

4

100~320

39~72

200

V-4EVM0307

50

1.5

4

100~320

46~85

200

V-2EVM0502

65

0.75

2

100~300

11~27

200

V-2EVM0503

65

1.1

2

100~300

16~40

200

V-2EVM0504

65

1.5

2

100~300

21~52

200

V-2EVM0505

65

2.2

2

100~300

29~67

200

V-2EVM0506

65

2.2

2

100~300

32~80

200

V-2EVM0507

65

3

2

100~300

38~93

200

V-2EVM0508

65

3

2

100~300

43~108

200

V-2EVM0510

65

4

2

100~300

55~132

200

V-3EVM0502

65

0.75

3

150~450

11~27

200

V-3EVM0503

65

1.1

3

150~450

16~40

200

V-3EVM0504

65

1.5

3

150~450

21~52

200

V-3EVM0505

65

2.2

3

150~450

29~67

200

V-3EVM0506

65

2.2

3

150~450

32~80

200

V-3EVM0507

65

3

3

150~450

38~93

200

V-3EVM0508

65

3

3

150~450

43~108

200

V-3EVM0510

65

4

3

150~450

55~132

200

V-4EVM0502

65

0.75

4

200~600

11~27

200

V-4EVM0503

65

1.1

4

200~600

16~40

200

V-4EVM0504

65

1.5

4

200~600

21~52

200

V-4EVM0505

65

2.2

4

200~600

29~67

200

V-4EVM0506

65

2.2

4

200~600

32~80

200

V-4EVM0507

65

3

4

200~600

38~93

200

V-4EVM0508

65

3

4

200~600

43~108

200

V-4EVM0510

65

4

4

200~600

55~132

200

V-2EVM1002

80

1.5

2

200~560

14~30

300

V-2EVM1003

80

2.2

2

200~560

20~47

300

V-2EVM1004

80

3

2

200~560

28~61

300

V-2EVM1005

80

4

2

200~560

36~76

300

V-2EVM1006

80

4

2

200~560

42~91

300

V-2EVM1008

80

5.5

2

200~560

58~122

300

V-3EVM1002

80

1.5

3

300~840

14~30

300

V-3EVM1003

80

2.2

3

300~840

20~47

300

V-3EVM1004

80

3

3

300~840

28~61

300

V-3EVM1005

80

4

3

300~840

36~76

300

V-3EVM1006

80

4

3

300~840

42~91

300

V-3EVM1008

80

5.5

3

300~840

58~122

300

V-4EVM1002

100

1.5

4

400~1120

14~30

300

V-4EVM1003

100

2.2

4

400~1120

20~47

300

V-4EVM1004

100

3

4

400~1120

28~61

300

V-4EVM1005

100

4

4

400~1120

36~76

300

V-4EVM1006

100

4

4

400~1120

42~91

300

V-4EVM1008

100

5.5

4

400~1120

58~122

300

V-2EVM1802

80

3

2

300~920

19~45

500

V-2EVM1803

80

5.5

2

300~920

30~67

500

V-2EVM1804

80

7.5

2

300~920

40~90

500

V-2EVM1805

80

7.5

2

300~920

50~112

500

V-2EVM1806

80

11

2

300~920

64~136

500

V-2EVM1807

80

11

2

300~920

76~159

500

V-2EVM1808

80

15

2

300~920

86~180

500

V-3EVM1802

100

3

3

450~1380

19~45

500

V-3EVM1803

100

5.5

3

450~1380

30~67

500

V-3EVM1804

100

7.5

3

450~1380

40~90

500

V-3EVM1805

100

7.5

3

450~1380

50~112

500

V-3EVM1806

100

11

3

450~1380

64~136

500

V-3EVM1807

100

11

3

450~1380

76~159

500

V-3EVM1808

100

15

3

450~1380

86~180

500

V-4EVM1802

125

3

4

600~1840

19~45

500

V-4EVM1803

125

5.5

4

600~1840

30~67

500

V-4EVM1804

125

7.5

4

600~1840

40~90

500

V-4EVM1805

125

7.5

4

600~1840

50~112

500

V-4EVM1806

125

11

4

600~1840

64~136

500

V-4EVM1807

125

11

4

600~1840

76~159

500

V-4EVM1808

125

15

4

600~1840

86~180

500

V-2EVM0304

50

0.75

2

50~160

26~48

200

V-2EVM0305

50

1.1

2

50~160

32~61

200

V-2EVM0306

50

1.1

2

50~160

39~72

200

V-2EVM0307

50

1.5

2

50~160

46~85

200

V-3EVM0304

50

0.75

3

75~240

26~48

200

V-3EVM0305

50

1.1

3

75~240

32~61

200

V-3EVM0306

50

1.1

3

75~240

39~72

200

V-3EVM0307

50

1.5

3

75~240

46~85

200

V-4EVM0304

50

0.75

4

100~320

26~48

200

V-4EVM0305

50

1.1

4

100~320

32~61

200

V-4EVM0306

50

1.1

4

100~320

39~72

200

V-4EVM0307

50

1.5

4

100~320

46~85

200

V-2EVM0502

65

0.75

2

100~300

11~27

200

V-2EVM0503

65

1.1

2

100~300

16~40

200

V-2EVM0504

65

1.5

2

100~300

21~52

200

V-2EVM0505

65

2.2

2

100~300

29~67

200

V-2EVM0506

65

2.2

2

100~300

32~80

200

V-2EVM0507

65

3

2

100~300

38~93

200

V-2EVM0508

65

3

2

100~300

43~108

200

V-2EVM0510

65

4

2

100~300

55~132

200

V-3EVM0502

65

0.75

3

150~450

11~27

200

V-3EVM0503

65

1.1

3

150~450

16~40

200

V-3EVM0504

65

1.5

3

150~450

21~52

200

V-3EVM0505

65

2.2

3

150~450

29~67

200

V-3EVM0506

65

2.2

3

150~450

32~80

200

V-3EVM0507

65

3

3

150~450

38~93

200

V-3EVM0508

65

3

3

150~450

43~108

200

V-3EVM0510

65

4

3

150~450

55~132

200

V-4EVM0502

65

0.75

4

200~600

11~27

200

V-4EVM0503

65

1.1

4

200~600

16~40

200

V-4EVM0504

65

1.5

4

200~600

21~52

200

V-4EVM0505

65

2.2

4

200~600

29~67

200

V-4EVM0506

65

2.2

4

200~600

32~80

200

V-4EVM0507

65

3

4

200~600

38~93

200

V-4EVM0508

65

3

4

200~600

43~108

200

V-4EVM0510

65

4

4

200~600

55~132

200

V-2EVM1002

80

1.5

2

200~560

14~30

200

V-2EVM1003

80

2.2

2

200~560

20~47

200

V-2EVM1004

80

3

2

200~560

28~61

200

V-2EVM1005

80

4

2

200~560

36~76

200

V-2EVM1006

80

4

2

200~560

42~91

200

V-2EVM1008

80

5.5

2

200~560

58~122

200

V-3EVM1002

80

1.5

3

300~840

14~30

200

V-3EVM1003

80

2.2

3

300~840

20~47

200

V-3EVM1004

80

3

3

300~840

28~61

200

V-3EVM1005

80

4

3

300~840

36~76

200

V-3EVM1006

80

4

3

300~840

42~91

200

V-3EVM1008

80

5.5

3

300~840

58~122

200

V-4EVM1002

100

1.5

4

400~1120

14~30

200

V-4EVM1003

100

2.2

4

400~1120

20~47

200

V-4EVM1004

100

3

4

400~1120

28~61

200

V-4EVM1005

100

4

4

400~1120

36~76

200

V-4EVM1006

100

4

4

400~1120

42~91

200

V-4EVM1008

100

5.5

4

400~1120

58~122

200

V-2EVM1802

80

3

2

300~920

19~45

200

V-2EVM1803

80

5.5

2

300~920

30~67

200

V-2EVM1804

80

7.5

2

300~920

40~90

200

V-2EVM1805

80

7.5

2

300~920

50~112

200

V-2EVM1806

80

11

2

300~920

64~136

200

V-2EVM1807

80

11

2

300~920

76~159

200

V-2EVM1808

80

15

2

300~920

86~180

200

V-3EVM1802

100

3

3

450~1380

19~45

200

V-3EVM1803

100

5.5

3

450~1380

30~67

200

V-3EVM1804

100

7.5

3

450~1380

40~90

200

V-3EVM1805

100

7.5

3

450~1380

50~112

200

V-3EVM1806

100

11

3

450~1380

64~136

200

V-3EVM1807

100

11

3

450~1380

76~159

200

V-3EVM1808

100

15

3

450~1380

86~180

200

V-4EVM1802

125

3

4

600~1840

19~45

200

V-4EVM1803

125

5.5

4

600~1840

30~67

200

V-4EVM1804

125

7.5

4

600~1840

40~90

200

V-4EVM1805

125

7.5

4

600~1840

50~112

200

V-4EVM1806

125

11

4

600~1840

64~136

200

V-4EVM1807

125

11

4

600~1840

76~159

200

V-4EVM1808

125

15

4

600~1840

86~180

200

Home

EVM

iLP

HDR

CFP

HES

HC

HTM

SRH / SRHD

Contact us

275 Hongsanro Wansangu Jeonjusi Jeollabukdo 54966 KOREA

Tel : +82-63-228-0560   Fax : +82-63-228-0561   e-mail : akorm@akorm.com   Website : www.akorm.com/hspump

Copyright (C)   AKORM Corporation   All Rights Reserved